Inspections
STQ Vantage are experienced UK specialist inspectors of fall arrest lifeline systems, conforming to BS 7883, BS EN795 and CEN/TS 16415. Having inspected and certificated systems since 1995, the STQ Vantage team are experienced in providing a fast, responsive and proactive service.
Testimonial
“I just wanted to say how pleased I was with the testing engineers who came on site this week – I felt they were thorough and professional.”
Jeni – A London Academy
What Is The Frequency For Lightning Protection System Testing?
As a minimum they must be tested in accordance with the relevant British Standard, in accordance with The Electricity at Work Regulations 1989 – either BS 6651:1999 or BS EN 62305. They state the maximum period between inspections should be twelve months.
The initial lightning protection system test should be thorough and detailed in accordance with BS 6651 / BS EN 6
2305, with the following years taking less extensive visual inspections.